Distribution facilities
Erection of 110 kV GIS in SS 110/20 kV Izola – turnkey project
Scope of works:
- Construction works,
- Electrical design,
- Secondary equipment cabinets manufacturing,
- Supply, erection and installation of primary equipment, cable system and secondary equipment,
- Configuration and parametrization,
- FAT, SAT and commissioning.
Implementation year: 2024
Investor:
Elektro Primorska d.d. in ELES d.o.o.
Back