Power Plant
GIS switchyard in combined heat and power plant (CHP) Ljubljana
Scope of work:
- Supply and installation of 110 kV GIS switchyard
- Assembly, supply and installation of secondary equipment such as FAT and SAT tests
- secondary equipment for control and protection
- FAT and SAT tests
- Commisioning
In January 2019 we, as a leading contractor, signed a contract with investor SODO for the project ''Supply and installation of 110 kV GIS switchyard, secondary equipment for control and protection of the GIS switchyard and GIS cable lugs''.
Implementation year: 2019
Investor:
SODO d.o.o. Minarikova ulica 5, 2000 Maribor, Slovenija
Back