Cable lane I: 110 kV cable connection on the route SS TETOL – SS PCL

Electricity transmission facilities

Construction of cable trench and electrical installation and assembly works for supply and installation of 110 kV cable for the route 110 kV SS TETOL – SS PCL

Cable lane I: 110 kV cable connection on the route SS TETOL – SS PCL

Scope of works:

  • construction works, supply, laying and connection of 110 kV cable system.

Implementation year: 2022

Investors:  

Elektro Ljubljana d.d. in ELES d.o.o. (previously SODO d.o.o.)


Back